Track levelling in Beckfoot Engine Shed

Submitted by andrew.sdr on Tue, 20 Apr 2021 - 00:50
Inspection roads levelled inside Beckfoot Shed
Inspection roads levelled inside Beckfoot Shed

Work was carried out in mid April 2021 at Beckfoot Engine shed:

  • The inspection pit roads were deep-cleaned and most of the filth was removed
  • The tracks into and over the inspection pits were levelled because the whole trackbed had been sloping towards the lakeside
  • Old rickety fencing was removed and replaced with a solidly fixed steel bar alongside No.1 shed road
Pit roads cleaned inside Beckfoot Shed
Pit roads cleaned inside Beckfoot Shed